DATE

TIME

WORK SHEET FOR: Jeff Baumann Daytona

WORK PERFORMED

PARTS

Mon

2.5

Try to get car going, charge battery, tap float bowl to stop gas over flow.

Move and store parts boxes, Got engine running 3 minutes, great oil pressure, wouldn't idle. Guessing low vacuum going to try bypassing pwr brake. Master cyl empty, going to add fluid to get some brakes.

Pwr steer fluid ok.

1/13/03

Payment $2500.00

Tues

3.2

Move and jack up car. Remove all wheels. Loosen bleeders and add brake fluid. Got little or no pedal. Add antifreeze, Radiator leaks left center, Remove vacuum fitting going to pwr brake booster. start engine, see if any difference. Get engine running, better this time, wants to be choked, at least it now idles.

1 gal antifreeze

 

1 qt brake fluid

Wed

1.0

Move all boxes of parts to storage shelf in shop, Rebox as necessary. Not organizing parts at this time.

 

Fri

1.5

Bleed brakes manually and pressure bleeder. Got front brakes and partial rears. Need to finish bleeding rear wheels with a helper.

 

Mon

1.5

Finish bleeding rear brakes.

Awesome pedal. Getting the brakes this good at this time will dictate how the brakes are handled in the future since the car will be here for an extended stay.

 

Tues

2.0

Resolve body mounts, compare to George’s car. George’s car, ’80 Corvette type all rubber and ¼ inch taller. Need replacing, Baumann mounts 1/4 inch lower and all steel. Order new mounts.

6 GM body mounts, ea are 2 piece units

$180.00