DATE

TIME

WORK SHEET FOR: Drake ’67 Coupe

WORK PERFORMED

PARTS

Tues

1.5

Wash undercoat with thinner scraper at underside of right rear 1/4 panel .

Payment Rec’d 12/12/02

$2000.00

Fri

2.5

Grind under side rt 1/4. Make cardboard pattern. Apply two layers fiberglass cover with wax paper for smoothness.

 

Mon

3.0

Make wheel opening edge template from another car. Trace template and cut wheel opening. Bevel grind original fiberglass at repair area top surface. Apply 3 layers 1 oz fiberglass mat. Bake 1 hour cure over night.

Fiberglass materials,

Body filler materials.

Tues

2.5

Scrub back side rt rr 1/4 bumper bolt hole repair area. Grind surface, tape cardboard pattern on front side. Apply 4 layers fiberglass at wheel opening.

 

Fri

3.5

Level grind rt rear 1/4 fiberglass Repair. True up wheel opening edge. Fabricate wheel opening lip. Install lip.

 

Mon

2.5

Grind, trim and size rt rear 1/4 wheel opening lip. Grind bumper bolt area. This area had been hit, minor damage. Discover small but additional chunk of lip missing rear part of wheel opening. Discover damage rear body panel near tail lights.

 

Total Labor This Sheet

15.5 Hrs.

Total Parts & Material This Sheet