DATE

TIME

WORK SHEET FOR: Allan Drake ’67 Coupe

WORK PERFORMED

PARTS

Tues.

3.0

Prepare and apply fiberglass to 5 repair areas right rear: side bumper mounting hole, rear of wheel opening lip, rear tail light panel 2 places.  

Wed.

3.0

Prepare and apply fiberglass to 3 repair areas right rear. Grind and shape bumper bolt repair area.  

Thurs.

3.0

Grind and shape fiberglass at three repair areas right rear. Apply body filler at right rear 1/4 panel and wheel opening. Block sand and shape body filler.  

Mon.

3.5

Do more detail body filler work to rt. rear at bumper bolt area inner and outer. Finish off small area at wheel opening.

 

Tues.

2.5

Finish detail hand sanding all repair areas. Begin machine sanding that area of car.

 

Thurs.

1.5

More machine sanding. Factory primer was baked, very tough.

 

Fri.

4.5

Finish machine sanding roof. Remask rear window, windshield, right door opening. Shallow grind rear body seam and right quarter body seam. Block sand body seam repairs, machine finish sand. This process checks integrity of factory seam.

 

Mon

3.0

Hand sand front and rear window edges, door edges, and light openings. Apply two coats epoxy primer to right side of roof, right rear ¼ panel, right side of rear deck.

1 quart epoxy primer

Total Labor This Sheet

24.0 Hrs.

Total Materials this sheet